Maintenance

Mon 10 Aug 2026

Logged today
1
AF301 grease change · 09:14
Logged this week
5
Across 4 machines, 2 plants
Most recent
AF301
Grease change · J. Smith · 09:14 today

Recent events — last 7 days

Date Machine Event Category Logged by Duration
10 Aug 09:14 AF301 Grease change Part Replacement J. Smith 28 min
06 Aug CR302 CSS gap 24→22mm Setup Change K. Patel 12 min
04 Aug CR301 Liner change — secondary Part Replacement J. Smith 143 min
03 Aug SC301 Routine inspection — pass Inspection M. Torres 35 min
Looking for trends, not just a log? Machine History plots every logged event against the sensor data.

Log Maintenance Event

1 · Select plant
2 · Equipment type
3 · Specific unit
CR301 · Current amps 176A Run hrs: 14,888h
Event category
Event detail
Who & when

Who did the work. Logged by is captured automatically.

min

Edit if needed.

Parts used

Part numbers are optional. Used for inventory tracking only.

Site Dashboard

Monday 10 Aug 2026  ·  Shift 2 of 3  ·  4h 23m remaining

Live  ·  17:37:12
Running circuit 10mm Concrete  ·  P3 + P4 Declared 10:05 by M. Karan

Power & Energy

Plant 1 No data yet
Power config pending
All equipment awaiting power factor configuration
Plant 3 603 kW
Last 4h · direct measurement Peak demand: 612 kW
Plant 4 728 kW *
Last 4h · measured equipment only * 5 of 8 machines
Plant 1 Stopped
0 TPH
Shift: 0T  ·  Today: 5,334T
Stopped since 06:24
Plant 3 Running
1,277 TPH
Shift: 5,334T  ·  Today: 10,668T
Shift plan On track  97%
5,334T actual5,500T target
Last logged: AF301 grease change · J. Smith · 09:14 today
Plant 4 Running
509 TPH
Shift: 1,562T  ·  Today: 6,896T
Shift plan On track  98%
1,562T actual1,600T target

Shift 2 Targets

Progress Shift actual / target Today total
10mm Concrete
1,240 / 1,500T
Today: 6,574T
At risk
Manufactured Sand
860 / 800T
Today: 3,002T
Met
Crusher Dust
180 / 1,532T
Today: 1,048T
Behind
Day total (Shift 1 actual + Shift 2 to now) 10,624T  of ~18,000T day target

Production Planning

Click any day to open its plan

Week of 10 Aug 2026
Circuit Config Mon 10Tue 11Wed 12Thu 13Fri 14
10mm Concrete 1500T1500T800T1200T
Manufactured Sand 800T800T800T800T400T
Crusher Dust 600T600T600T
20mm Road Base 2000T2000T
Day total 2,900T2,900T3,400T3,600T1,600T
Day status Mon 10Tue 11Wed 12Thu 13Fri 14
Plan status 🔒 Committed 🔒 Committed Draft Draft + Create plan

Shift Progress

Mon 10 Aug 2026  ·  4h 23m remaining in Shift 2

Live · 17:37
Carryover from Shift 1: Crusher Dust −332T applied to Shift 2 effective target (1,200T plan → 1,532T effective). 10mm met exactly — no carryover.
10mm Concrete
1,240T
Target: 1,500T  ·  83%
⚠ At risk
Proj: 418T  ·  Plan: 1,500T
Manufactured Sand
860T
Target: 800T  ·  107%
✓ Met
Proj: 860T  ·  Plan: 800T
Crusher Dust
180T
Target: 1,532T  ·  12%
Incl. 332T carryover from Shift 1
▼ Behind
Proj: 180T  ·  Plan: 1,200T
Live rate
127 TPH
4-week avg: 131 TPH
W30: 134 · W29: 118 · W28: 129
P3: 1,277  ·  P4: 509 TPH
Power consumed so far 2,113 kWh
P3 only · P4 pending power factor

Cumulative tonnes — Shift 2 (in progress)

All circuits combined  ·  Dashed = effective target  ·  Markers = events

Actual tonnes Effective target Circuit mode

Events this shift

Circuit mode declared: 10mm Concrete · P3+P4 · M. Karan
14:05
Operator adjustment: AF301 speed 22Hz → 19Hz · M. Karan
15:18
Operator adjustment: BF402 speed 34Hz → 31Hz · M. Karan
17:02

Plant status

Plant 3 Running · 1,277 TPH
Plant 4 Running · 509 TPH

Historical comparison — Shift 2

This shift (projected)418T▼ 82T below target
Same shift last week506T✓ Hit
Same shift 2 weeks ago481T▼ Missed by 19T
4-week average494T
Best Shift 2 this month531TMon 3 Aug

Recovery arithmetic

Remaining shift time4h 23m
Current rate127 TPH
Rate needed (10mm)152 TPH
Gap to close82T
Crusher Dust gap1,352T — not recoverable
Crusher Dust is 1,352T behind effective target. At current rate, recovery in this shift is not possible. Expect carryover into Shift 3.

Machine History

CR302 — Power (kW) — Last 7 days

Avg: 106.2 kW  ·  Min: 90.1  ·  Max: 122.4  ·  700 data points

Power (kW) Maintenance event Operator adjustment
Note: No historian data exists for 11 May–15 Jun 2026. Date ranges spanning this period will show a gap. This is a confirmed collection gap, not a query error.

Events on this timeline

Filter:
Date Event Category Completed by Logged by Duration Run hrs
04 Aug Liner change — secondary Part Replacement J. Smith J. Smith 143 min 14,761h
06 Aug CSS gap 24mm → 22mm Setup Change K. Patel K. Patel 12 min 14,801h
08 Aug 06:41 VSD speed C306: 22Hz → 19Hz Operator Adjustment M. Karan M. Karan
12 Jul Oil change Part Replacement M. Torres M. Torres 28 min 14,201h

Power & Energy

Billing period: 1–31 Aug 2026

⚡ Peak tariff active
Period
Site total · Last 24 hours

Equipment detail — Plant 3

Click a plant card above to switch

Reports

Click any report to preview inline · Download or share from the preview panel

Type:
Report Period Generated Version Status Actions
Monthly Production Summary Jul 2026 01 Aug 00:05 v1 Ready
Monthly Energy Summary Jul 2026 01 Aug 00:06 v1 Ready
Machine Utilisation Report W31 — 4 Aug 2026 03 Aug 2026 v1 Ready
Maintenance Event Summary Jul 2026 01 Aug 00:07 v1 Ready
Machine Utilisation Report W30 — 28 Jul 2026 27 Jul 2026 v1 Ready
Monthly Production Summary Aug 2026 Scheduled
Generates 01 Sep 2026 00:05
Monthly Energy Summary Aug 2026 Scheduled
Generates 01 Sep 2026 00:06

Report delivery

Who receives each report automatically when it generates

Monthly Production Summary
J. WilliamsR. KumarG. Pearson (GM)
1st of month 00:05
Monthly Energy Summary
J. WilliamsR. Kumar
1st of month 00:06
Machine Utilisation Report
R. KumarJ. Smith
Monday 06:00
Maintenance Event Summary
J. SmithR. Kumar
1st of month 00:07

Settings & Configuration

Tag Name Plant Equipment Field Points Status
[P3plc]CR301_Pwr.Val_kW P3plc CR301 V_D 749 Approved Edit
[P3plc]CR302_Pwr.Val_kW P3plc CR302 V_D 749 Approved Edit
[P3plc]CR303_Pwr.Val_kW P3plc CR303 V_D 749 Approved Edit
[P4plc]CR402_Amps_AIn.Val P4plc CR402 V_D 137 Approved Edit
[P4plc]CR403_Amps_AIn.Val P4plc CR403 V_D 137 Approved Edit
[P4plc]PT406.Inp_HiHiGate P4plc PT406 V_B 749 Pending Edit
[P1plc]AF101_VSD.MOTOR_CURRENT P1plc AF101 V_D 749 Pending Edit
[P3plc]AF301_Pwr.Val_kW P3plc AF301 V_D 749 Approved Edit
Showing 8 of 3,423 tags · 3,192 approved · 231 pending

Electricity tariff

Drives the billing period tracker and cost estimates on the Power & Energy page. Modelled on a large commercial/industrial (C&I) NSW connection — network and retail charges are configured separately, since they renew on different cycles.

Active — effective 1 Jul 2026

Day of month the invoice period begins

to
c/kWh
to
c/kWh
to
c/kWh

Real power, as measured

A coordinated startup of multiple crushers within the same 30-minute window can set this charge for the entire billing period, even if average load is much lower the rest of the month. The Energy page will flag demand spikes as a specific cost event once this is configured.

Tariff history

Network charges typically renew 1 July each year
Effective from Effective to Peak rate Demand rate Status
1 Jul 2026 31.2 c/kWh $18.40/kW Active
1 Jul 2025 30 Jun 2026 28.9 c/kWh $17.10/kW Superseded

Rates are effective-dated, not overwritten — historical billing calculations always use the rate that was active at the time, even after this year's rates change.